FAQ4734
How is labour cost calculated in an abnormally low tender justification?
In labour costs, the wage, working time, social costs and the elements that the legislation treats as mandatory are taken into account. Consistency with the tender documents and, where applicable, with the EKAP labour cost tools must be checked in the calculation.