TERM
Minimum Stock Level
The minimum level of the materials required by the contracting authority. The authority must complete the necessary replenishment or procurement before that level is reached. The minimum stock level should generally be sufficient to meet the authority's requirements, having regard also to the possibility of delay in concluding a fresh contract or in allocation by higher authorities.